Votre projet, parlons-en

Contactez un expert Altereo

Projet d'étude, d'urbanisme ou d'informatique Opération de communication ou événementiel Recherche de partenariat, relation presse N'hésitez-pas, contactez-nous.




Voir directement nos implantations et coordonnées
Loading...
Home>Highlighted projects
Highlighted projects 2021-03-02T14:51:38+01:00

Preliminary study prior to the assumption of responsibility for the public rainwater management service

Preliminary study prior to the assumption of responsibility for the public rainwater management service The DLVA (Durance-Luberon-Verdon Agglomeration) brings together 25 municipalities (Allemagne en Provence, Brunet, Corbières-en-Provence, Entrevennes, Esparron-de-Verdon, Gréoux-les-Bains, La Brillanne, Le Castellet, Manosque, Montfuron, Montagnac-Montpezat, Oraison, Pierrevert, Puimichel, Puimoisson, Quinson, Riez, Roumoules, Saint-Laurent du Verdon, Saint-Martin de Brômes, Sainte-Tulle, Valensole, Vinon-sur-Verdon, Villeneuve, Volx), on a territory of 846 km² where 62,000 inhabitants live, i.e. nearly 40% of the population of the Alpes [...]

Preliminary study prior to the assumption of responsibility for the public rainwater management service

Preliminary study prior to the assumption of responsibility for the public rainwater management service The DLVA (Durance-Luberon-Verdon Agglomeration) brings together 25 municipalities (Allemagne en Provence, Brunet, Corbières-en-Provence, Entrevennes, Esparron-de-Verdon, Gréoux-les-Bains, La Brillanne, Le Castellet, Manosque, Montfuron, Montagnac-Montpezat, Oraison, Pierrevert, Puimichel, Puimoisson, Quinson, Riez, Roumoules, Saint-Laurent du Verdon, Saint-Martin de Brômes, Sainte-Tulle, Valensole, Vinon-sur-Verdon, Villeneuve, Volx), on a territory of 846 km² where 62,000 inhabitants live, i.e. nearly 40% of the population of the Alpes [...]

Altereo in Namibia

Altereo in Namibia Feasibility study and detailed design to secure the drinking water production and transfer system for the Naute-Keetmanshoop area  The project took shape in 2016 following the visit to France of Namibia’s President, Dr. Hage Geingob, which brought together the Namibian authorities, the French Embassy in Namibia and Altereo to discuss the urgent water-related issues in the country including the  networks ageing and the resurgence of leaks. Thus, [...]

Landscape integration of wastewater pumping stations of the Arcachon Basin

Landscape integration of wastewater pumping stations of the Arcachon Basin The 10 municipalities of the « Bassin d’Arcachon » have joined together in an Intercommunal Syndicate of the Bassin d’Arcachon (SIBA) to pool the means of operating their collective sanitation service. Today, the effluents of the Bassin d’Arcachon are treated by 3 treatment plants for a total capacity of 290 000 inhabitants, and a common discharge of treated water 800 metres into the sea at the [...]

Urban study for the enhancement and preservation of the identity of ancient town centres and hamlets

Urban study for the enhancement and preservation of the identity of ancient town centres and hamlets Saint-Quentin-en-Yvelines (SQY), which has been an urban community since 2004, comprises 12 municipalities (Coignières, Élancourt, Guyancourt, La Verrière, Les Clayes-sous-Bois, Magny-les-Hameaux, Maurepas, Montigny-le-Bretonneux, Trappes, Plaisir, Villepreux and Voisins-le-Bretonneux) in western Paris and has a population of 230,000. It is an integral part of the Paris-Saclay and Greater Paris Operation of National Interest. [...]